• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Lusail Expressway Temporary Bridge, Qatar

The 5.3km route will comprise four lanes of highway, with additional lanes to provide for traffic movement between the interchanges.

CCL was approached to provide a solution for the building of a temporary bridge as part of the Lusail Expressway, which would allow construction work to continue in the adjacent area whilst the temporary structure was erected. The response from CCL was to design a specialised grout cap, which was installed at dead-end anchors so that the stress could be applied at one end only, leaving the adjoining area unaffected.

CCL’s fleet of specialist equipment and engineers in Qatar enabled the company to respond quickly to the request and carry out the work at very short notice.

 

  • Download Case Study
  • Go Back
  • Lusail Expressway

    CONTACT US

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    Get In Touch


    Website design and build by Grey Matter | web design sheffield