• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

King Road Tower, Jeddah, KSA

King Road Tower in Jeddah contains 36 floors of combined commercial and office space, a health club, two underground parking areas and a shopping mall at ground-floor level.

The designers asked CCL to provide a solution which would maximise space whilst still allowing architectural freedom within the tower, creating a large open space for this landmark project. CCL optimised the design, using the benefits of post-tensioning, which allows large spans even where high loadings occur.

The load-balancing techniques used in the post-tensioned design minimised the number of beams, providing greater flexibility of layout for the location of services in the final fit-out. CCL utilised the design experience of its design company, CCL Engineering, which employs over 100 engineers. The company can ensure that even large and complex projects can be delivered within short timescales.

CCL slabs produced savings in both time and material, compared to traditional construction methods. The thinner slabs reduced the amount of concrete and reinforcement required, whilst faster installation enabled formwork to be stripped and redeployed more quickly.

Quality was assured throughout the process, with CCL Engineering undertaking the design and CCL providing coordination. All components were supplied and controlled by CCL’s UK manufacturing division.

 

  • Download Case Study
  • Go Back
  • King Road Tower

    CONTACT US

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    Get In Touch


    Website design and build by Grey Matter | web design sheffield