• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Videos
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Ghana

Company Name
CCL Ghana Stressing Systems Limited

Primary Contact
Roni Gabi Mattouk

Address
Private Mail Bag 76, KIA
C8/21 Tenbibian Street
Abelenkpe
Accra
Ghana

T: +233 302 797 179
E:  cclghana@cclint.com

Projects undertaken include:

University of Ghana Teaching Hosptial, Accra

CCL was commissioned to design and install a total floor area of 3,680 m2 with a total slab thickness of 350 mm using the bonded post-tensioning system.

Osu Villa, Accra 

This project constructed by ARG1 Africa Construction, has a total floor area of 443 m2. CCL designed, supplied and installed the flat slab at a thickness of 200 mm using the bonded post-tensioned system.

Henrietta's Place, Accra

Henrietta’s Place is a development of three 3-storey apartments in Ghana’s capital city. CCL provided design, supply and installation solutions for nine slabs of 200 mm thickness, using the CCL bonded post-tensioning system.

CONTACT US

CCL
Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield