• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Videos
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Case Studies

Find out how CCL expertise has been used on projects throughout the world and how it can add value to your own project.

 

SLAB SOLUTIONS+

 

The Diamond, Sheffield University, UK

The £81 m Diamond is designed to be the new home of the Faculty of Engineering at the University of Sheffield offering modern multidisciplinary teaching and learning.

Read Case Study

Index Tower

Index Tower, Dubai, UAE

Index Tower is a prestigious 86-storey structure designed by architects Norman Foster + Partners, developed by Union Properties and located in the heart of the Dubai International Financial Centre.

Read Case Study

 Athena

Athena, Stratford High Street, London, UK

A landmark mixed-use development, Athena, is a dual-tower structure at 160-188 Stratford High Street in the London Borough of Newham. The main tower rises 26 storeys with an adjoining low-rise block of 10 storeys. Athena gives long-range views across London and the Olympic Park.

Read Case Study

 

The Tower, One St. George Wharf, London, UK

Standing 181 metres tall, slender and circular and containing 212 luxury apartments, The Tower, One St George Wharf is one of the tallest, wholly residential buildings in Europe.

Read Case Study

 Beirut Tower

Beirut Tower, Beirut, Lebanon

Beirut Tower is a 25-storey residential development on Beirut’s sea front. This luxurious multi-storey building  has a construction area of around 50,000 m2 with an average floor area of approximately 2,000 m2.

Read Case Study

 AKH Tower

AKH Tower, Doha, Qatar

AKH Tower is an impressive structure in the West Bay business district of Doha in Qatar.

Read Case Study

 Birmingham Dental Hospital

Birmingham Dental Hospital, UK

With a build cost of £50 m, this new 1.23-hectare, four-storey dental hospital and school of dentistry, will provide world-class research facilities for more than 600 undergraduate and postgraduate students.

Read Case Study

 Al Dana Tower

Al Dana Tower, Doha, Qatar

Al Dana Tower is an innovative flagship structure, close to the City Center Mall in the West Bay business district of Doha. CCL was commissioned to design, manufacture and install 49,000 m2 of post-tensioned slabs.

Read Case Study

 Al Nakheel Tower

Al Nakheel Tower, Riyadh, KSA

The Al Nakheel Tower is a prestigious building, dominating the centre of Riyadh, off King Fahad Road, near King Abdullah financial district.

Read Case Study

 Imagination Technologies

Imagination Technologies, Kings Langley, UK

The headquarters of Imagination Technologies were designed to achieve a rating of ‘excellent’ under the BREEAM system of sustainable buildings.

Read Case Study

 Al Shemoukh

Al Shemoukh Twin Towers, Doha, Qatar

The £101.9 m Al Shemouk Twin Towers project in Doha, Qatar, is a commercial and retail development spanning a pair of 22-storey towers and central mezzanine level, with a combined area totalling 170,000 m2.

Read Case Study

 Bay Tower

Bay Tower, Beirut, Lebanon

Bay Tower is the latest addition to a long line of successful projects executed by SV Properties and Construction alongside the Beirut Tower on the Marina waterfront.

Read Case Study

 Marble Arch House

Marble Arch House, London, UK

The new sustainable development in London’s West End, Marble Arch House, features over 2,787 m² of high-quality office and retail space, and has received an ‘Excellent’ rating on the BREEAM assessment system.

Read Case Study

 Cais Office

Cais Office, Lisbon, Portugal

The Cais Office development is situated on the prestigious Parque de Nações site in Lisbon, between Oceanário de Lisboa and Pavilhão do Conhecimento. With a total area of 4,400 m2, the building represents an investment of approximately 15 million euros.

Read Case Study

 Gaylord Hotel

Gaylord Hotel & Convention Center, Maryland, USA

Gaylord National Hotel & Convention Center is one of the biggest construction projects completed this decade on the East Coast of the United States.

Read Case Study

 Strata

Strata SE1, London, UK

Strata SE1 is a 147-metre high, 43-storeys residential development in Elephant and Castle, central London.

Read Case Study

 Santa Anita Mall

Santa Anita Mall, Lima, Peru

Santa Anita Mall is one of the biggest malls to be constructed in Lima, Peru. It covers an area of 200,000 m2 and was constructed as the economic growth of the country increased and demand for retail activity grew.

Read Case Study

 River House Condominiums

River House Condominiums, Michigan, USA

River House Condominiums is the tallest high-rise in the city of Grand Rapids, Michigan.

Read Case Study

 WMDC Offices

WMDC Offices, Wakefield, UK

New civic offices for Wakefield Metropolitan District Council form part of the Merchant Gate development, a new business and leisure area in the heart of the city.

Read Case Study

 Parcel 18

Parcel 18 - The Pearl-Qatar, Doha, Qatar

Parcel 18 is a residential development located on The Pearl-Qatar: a ground-breaking $2.5 billion man-made island in the Arabian Gulf, off the coast of Doha, and one of the world’s largest construction projects.

Read Case Study

 Leeds ERB

University Energy Research Building, Leeds, UK

Leeds University has a new £7.9 million Energy Research building that will become a centre of excellence, nationally and internationally, for research into low-carbon technologies.

Read Case Study

 Hist Sor Trondelag

Hist Sor-Trondelag University College, Norway

The new technology buildings at Kalvskinnet are part of the university’s plan to centralise science, technology and teacher training on the one site.

Read Case Study

 St Regis

St. Regis Hotel and Residential towers, Doha, Qatar

St. Regis Hotel and Residential Towers is an impressive complex built in the West Bay area of Doha.

Read Case Study

 IMOCOM

IMOCOM Building, Lisbon, Portugal

Lisbon’s Parque das Nações district boasts yet another bold example of architecture. The IMOCOM building occupies a plot on the old Expo ‘98 site, adjacent to the city centre.

Read Case Study

 Chiswick Park

Chiswick Park, London, UK

Setting new standards for the working environment, the award-winning Chiswick Park provides office space for more than 12,000 people, making it the biggest employment hub in west London.

Read Case Study

 Morocco Mall

Morocco Mall, Casablanca, Morocco

Stretching across Corniche in Casablanca, and with a total surface area of 10 hectares, the Morocco Mall is the largest shopping mall project in North Africa, at a cost of 2 billion Moroccan Dirham (Eur=11.3MAD).

Read Case Study

ISF Camp

ISF Camp, Qatar

CCL were approached by their client to redesign an 18-metre steel beam to convert it to a post-tensioned beam.

Read Case Study

 Aberdeen ECC

Aberdeen Hospital ECC, UK

A £115 million emergency care centre (ECC) is being built in Aberdeen that will combine accident and emergency, an acute medical assessment unit, an out-of-hours GMED (Grampian Medical Emergency Department) service and ward accomodation at Aberdeen Royal Infirmary, in the largest project ever undertaken by the NHS in the north east of Scotland.

Read Case Study

 King Road Tower

King Road Tower, Jeddah, KSA

King Road Tower in Jeddah contains 36 floors of combined commercial and office space, a health club, two underground parking areas and a shopping mall at ground-floor level.

Read Case Study

 Casablanca Marina

Marina of Casablanca, Morocco

The Marina of Casablanca is 24 hectares of grounds, designated for regeneration and improvement by the Moroccan government and the urban district of Casablanca.

Read Case Study

 Loughborough Sports Park

The SportPark Loughborough University, UK

Developed by Sport England and Loughborough University, SportPark is an £11.5 million complex, which is home to the English national govering bodies of various sports, providing office space, storage areas and sports facilities.

Read Case Study

 St Rafqa

St Rafqa Basilica, Jrabta, Lebanon

Built on a mountainside at Jrabta in Lebanon, this imposing structure is designed to give the impression of a ship - its roof appearing to form a continuation of the surrounding hillside.

Read Case Study

 Uni of Rochester

University of Rochester, New York, USA

The Wilmot Cancer Centre at the University of Rochester in the state of New York is a 140,000 sq ft (42,672 m2) cancer research institute.

Read Case Study

 Wandle Park

New South Quarter - Wandle Park, Croydon, UK

New South Quarter is a £160 m contemporary urban village on the Purley Way, one mile from Croydon town centre and within easy travelling distance of London.

Read Case Study

 SkyGate

Sky Gate, Beirut, Lebanon

To accommodate the Lebanese law of setback requirements and because of its location between two buildings, the 42-storey Sky Gate residential development in Beirut has particularly unconventional geometry.

Read Case Study

 City of Lights

City of Lights, Abu Dhabi, UAE

The City of Lights, a new residential, commercial and business complex, is located on Al Reem Island, off the coast of Abu Dhabi. It includes the construction of a 61-level, 282.1 m-high office tower on top of a six-level podium structure with three basement car-parking levels.

Read Case Study

 Eagle House

Eagle House, London, UK

Eagle House stands at the heart of a new flagship mixed-use development close to the financial area of London.

Read Case Study

Paradise Dock

Paradise Dock, Lee Valley Park, London, UK

Paradise Dock on the River Lea in Hackney, east London was built in the 1830s to serve thriving local businesses, including the glass works, boat builders, indian rubber factory and the famous Carbonic works. Decommissioned and filled during the 1960s, the two-acre dock and surrounding area is now part of a large-scale regeneration project known as Paradise Park.

Read Case Study

 Olympic Village

Olympic Village, London, UK

The £2 bn Olympic Athletes’ Village was situated in the Olympic Park that hosted the London 2012 Olympic Games, allowing athletes to live within walking distance of the competition venues.

Read Case Study

 Waves Tower

The Waves Towers, Dubai, UAE

The Waves is a 600,000 sq ft (55,742 m2), two-tower freehold residential development, home to the city’s first residential waterpark and located in the prestigious Marina area of Dubai.

Read Case Study

 Worcester Library

Worcester Library and History Centre, UK

The Worcester Library and History Centre, also known as The Hive, is the first fully integrated public and university library in Europe. It consists of 10,000 sqm of public space over five floors.

Read Case Study

 Marina 101

Marina 101 Tower, Dubai, UAE

Marina 101 is an iconic structure that will stand tall along Dubai’s skyline, strategically located in the prestigious Dubai Marina.

Read Case Study

 Latitude 39

Latitude 39 Indianapolis, IL, USA

Latitude 39 Indianapolis is a 60,000 square feet luxury entertainment complex which includes restaurants, bars, luxury bowling, cinema and nightclub.

Read Case Study

 Bolanachi Building

Bolanachi Building, Bermondsey Spa, UK

Bermondsey Spa is a £150 million regeneration programme on the south bank of the River Thames. Covering 50 acres, the project will be delivered over a period of seven to ten years. CCL was engaged to supply and supervise the installation and stressing of CCL’s new flat slab un-bonded 0.6” XU system to eight levels of the Bolanachi Building at the heart of Bermondsey Spa.

Read Case Study

Silverene Towers

Silverene Twin Towers, Dubai, UAE

The Silverene Towers, located at the water’s edge of the Dubai Marina, rise 35 storeys high and have a total floor area of 108,174 m2.

Read Case Study

 Highfield Humanities

Highfield Humanities College, Blackpool, UK

Designed by the award winning architectural practice Feilden Clegg Bradley Studios, the state-of-the-art college was built under the Government’s BSF (Building Schools for the Future) scheme.

Read Case Study

 SPark One

Bristol & Bath Science Park, Bristol, UK

The SPark is a 54-acre £300 m development which opened in summer 2011 acting as a centre to connect businesses to new technologies.

Read Case Study

 La Galilee

Le Galilée Zac Andromede Blagnac, France

Le Galilée was designed by French architects Studio Bellecour, and is primarily an office building. It is located in the Andromède Urban Development Zone in Blagnac, near Toulouse in France.

Read Case Study

Frances Wharf, London, UK

Frances Wharf is a luxury nine storey residential building on the northern bank of the Limehouse Cut, a canal linking the River Thames to the River Lee.

Read Case Study

Hotel La Tour, Birmingham, UK

A new £24m four-star luxury hotel has been built close to the centre of Birmingham, after five years of planning, research and design. Hotel La Tour has 174 bedrooms, business space, a restaurant, bar and a street café.

Read Case Study

IYLO London

IYLO, London, UK

The 60 m-high IYLO tower is a landmark structure and an integral part of the £3.5 billion 2020 Vision regeneration plan for the London Borough of Croydon.

Read Case Study

Damac Heights, Dubai, UAE

Summer 2015 saw CCL’s completion of its work on the world’s fifth-tallest residential tower: DAMAC Heights. Standing at 85 storeys, the skyscraper is situated prominently on the Dubai Marina waterfront, overlooking the Palm Jumeirah. 

Read Case Study

Fort Belvoir Hospital Parking Garage, Virginia, USA

Fort Belvoir Community Hospital development is a $747 million, two million sq ft hospital expansion, built to vastly enhance Fort Belvoir’s medical capacity and capabilities.

Read Case Study

Post-tensioning+

A4 Reims

A4 Contournement Sud De Reims, France

A new bypass to the south of Reims forms a 14 km section of the A4 motorway and links Thillois and Taissy. It was constructed in order to help cope with the demand to carry an increasing volume of traffic. Some sections of the existing A4, which runs through the centre of the city, carry up to 26,500 vehicles per day.

Read Case Study

The Diamond, Sheffield University, UK

The £81 m Diamond is designed to be the new home of the Faculty of Engineering at the University of Sheffield offering modern multidisciplinary teaching and learning.

Read Case Study

Autoroute Marrakech

Autoroute Marrakech - Agadir, Morocco

The Autoroute ‘Marrakech - Agadir’ is the latest section of the north-south corridor of toll roads/expressways in Morocco, linking Tangier to Agadir. Building works began in 2006 and it was opened in 2010 by Prince Moulay Rachid.

Read Case Study

Index Tower

Index Tower, Dubai, UAE

Index Tower is a prestigious 86-storey structure designed by architects Norman Foster + Partners, developed by Union Properties and located in the heart of the Dubai International Financial Centre.

Read Case Study

Pont Aneho

Pont Aneho, Togo, Africa

In Aneho, a Togolese town on the border with Benin, an ambitious urban development project has taken place.

Read Case Study

Athena

Athena, Stratford High Street, London, UK

A landmark mixed-use development, Athena, is a dual-tower structure at 160-188 Stratford High Street in the London Borough of Newham. The main tower rises 26 storeys with an adjoining low-rise block of 10 storeys. Athena gives long-range views across London and the Olympic Park.

Read Case Study

 Concrete Milltower

Post-tensioned Concrete Wind Turbine Bases, Denmark

Vertical post-tensioning was carried out on three 84-metre-high concrete wind turbine bases by Skandinavisk Spændbeton, using 9-15 and 5-15/1-15 tendons.

Read Case Study

The Tower, One St. George Wharf, London, UK

Standing 181 metres tall, slender and circular and containing 212 luxury apartments, The Tower, One St George Wharf is one of the tallest, wholly residential buildings in Europe.

Read Case Study

 Beirut Tower

Beirut Tower, Beirut, Lebanon

Beirut Tower is a 25-storey residential development on Beirut’s sea front. This luxurious multi-storey building  has a construction area of around 50,000 m2 with an average floor area of approximately 2,000 m2.

Read Case Study

 Regents Canal Bridge

Regent's Canal Road Bridge, London, UK

The Eastern Goods Yard, Kings Cross Central, at £170 m, is one of central London’s most significant development and regeneration ventures.

Read Case Study

AKH Tower

AKH Tower, Doha, Qatar

AKH Tower is an impressive structure in the West Bay business district of Doha in Qatar.

Read Case Study

 El Jadida Highway

Casablanca - El Jadida Highway, Morocco

Bridge overpass PS4 on the Casablanca - El Jadida Highway is part of the Mediterranean Road Construction Project to upgrade the 50 km coastal road in Morocco.

Read Case Study

Birmingham Dental Hospital

Birmingham Dental Hospital, UK

With a build cost of £50 m, this new 1.23-hectare, four-storey dental hospital and school of dentistry, will provide world-class research facilities for more than 600 undergraduate and postgraduate students.

Read Case Study

 Fidar Bridge

Fidar Bridge, Lebanon

In September 2006, work began clearing the site for the reconstruction of the Fidar Bridge, south of Byblos. Following the destruction of the previous bridge during the 2006 war, the Council for Development and Reconstruction made the rebuilding of the structure one of its top priorities. The project was financed by Byblos Bank at a cost of $4 million, as a donation to the Lebanese government to contribute to the post-war rebuilding programme.

Read Case Study

Al Dana Tower

Al Dana Tower, Doha, Qatar

Al Dana Tower is an innovative flagship structure, close to the City Center Mall in the West Bay business district of Doha. CCL was commissioned to design, manufacture and install 49,000 m2 of post-tensioned slabs.

Read Case Study

Al Nakheel Tower

Al Nakheel Tower, Riyadh, KSA

The Al Nakheel Tower is a prestigious building, dominating the centre of Riyadh, off King Fahad Road, near King Abdullah financial district.

Read Case Study

 Urban Development Project

Urban Development Project, Tripoli, Lebanon

The covering of this important section of Abou Ali River in Tripoli Old Town was part of the Cultural Heritage and Urban Development Project (CHUD) for essential traffic and road improvements.

Read Case Study

Imagination Technologies

Imagination Technologies, Kings Langley, UK

The headquarters of Imagination Technologies were designed to achieve a rating of ‘excellent’ under the BREEAM system of sustainable buildings.

Read Case Study

 Faslane Viaduct

Faslane Viaduct HM Naval Base Clyde, Scotland

Faslane, 25 miles from Glasgow, is one of the two primary sites that constitute HM Naval Base Clyde, the naval services’ headquarters in Scotland. CCL was commissioned to undertake the post-tensioning work for the precast concrete-beam viaduct.

Read Case Study

 Latakia Highway

Latakia-Ariha Highway, Syria

The Latakia - Ariha Highway in Syria is a 98km-long road connecting the districts of Latakia, Aleppo and Idlib. Linking the Syrian coastal areas with the internal regions, the new highway is designed to relieve traffic congestion and provide much improved mobility throughout the region.

Read Case Study

Al Shemoukh

Al Shemoukh Twin Towers, Doha, Qatar

The £101.9 m Al Shemouk Twin Towers project in Doha, Qatar, is a commercial and retail development spanning a pair of 22-storey towers and central mezzanine level, with a combined area totalling 170,000 m2.

Read Case Study

 Jamarat Bridge

Jamarat Bridge, Mecca, KSA

The colossal, multi-storey Jamarat Bridge was constructed in order to prevent stampedes when the millions of Hajj pilgrims gather to stone the three pillars in the religious ritual, signifying the rejection of evil.

Read Case Study

Bay Tower

Bay Tower, Beirut, Lebanon

Bay Tower is the latest addition to a long line of successful projects executed by SV Properties and Construction alongside the Beirut Tower on the Marina waterfront.

Read Case Study

 Lusail Expressway

Lusail Expressway Temporary Bridge, Qatar

The Lusail Expressway will create a vital link to Doha’s Lusail City Development and cater for future light rail transit (LRT) and Metro’s Red Line North.

Read Case Study

Marble Arch House

Marble Arch House, London, UK

The new sustainable development in London’s West End, Marble Arch House, features over 2,787 m² of high-quality office and retail space, and has received an ‘Excellent’ rating on the BREEAM assessment system.

Read Case Study

 Cais Office

Cais Office, Lisbon, Portugal

The Cais Office development is situated on the prestigious Parque de Nações site in Lisbon, between Oceanário de Lisboa and Pavilhão do Conhecimento. With a total area of 4,400 m2, the building represents an investment of approximately 15 million euros.

Read Case Study

 Gaylord Hotel

Gaylord Hotel & Convention Center, Maryland, USA

Gaylord National Hotel & Convention Center is one of the biggest construction projects completed this decade on the East Coast of the United States.

Read Case Study

 Strata

Strata SE1, London, UK

Strata SE1 is a 147-metre high, 43-storeys residential development in Elephant and Castle, central London.

Read Case Study

Santa Anita Mall

Santa Anita Mall, Lima, Peru

Santa Anita Mall is one of the biggest malls to be constructed in Lima, Peru. It covers an area of 200,000 m2 and was constructed as the economic growth of the country increased and demand for retail activity grew.

Read Case Study

 River House Condominiums

River House Condominiums, Michigan, USA

River House Condominiums is the tallest high-rise in the city of Grand Rapids, Michigan.

Read Case Study

 WMDC Offices

WMDC Offices, Wakefield, UK

New civic offices for Wakefield Metropolitan District Council form part of the Merchant Gate development, a new business and leisure area in the heart of the city.

Read Case Study

 Parcel 18

Parcel 18 - The Pearl-Qatar, Doha, Qatar

Parcel 18 is a residential development located on The Pearl-Qatar: a ground-breaking $2.5 billion man-made island in the Arabian Gulf, off the coast of Doha, and one of the world’s largest construction projects.

Read Case Study

Leeds ERB

University Energy Research Building, Leeds, UK

Leeds University has a new £7.9 million Energy Research building that will become a centre of excellence, nationally and internationally, for research into low-carbon technologies.

Read Case Study

Hist Sor Trondelag

Hist Sor-Trondelag University College, Norway

The new technology buildings at Kalvskinnet are part of the university’s plan to centralise science, technology and teacher training on the one site.

Read Case Study

 St Regis

St. Regis Hotel and Residential towers, Doha, Qatar

St. Regis Hotel and Residential Towers is an impressive complex built in the West Bay area of Doha.

Read Case Study

 IMOCOM

IMOCOM Building, Lisbon, Portugal

Lisbon’s Parque das Nações district boasts yet another bold example of architecture. The IMOCOM building occupies a plot on the old Expo ‘98 site, adjacent to the city centre.

Read Case Study

 Chiswick Park

Chiswick Park, London, UK

Setting new standards for the working environment, the award-winning Chiswick Park provides office space for more than 12,000 people, making it the biggest employment hub in west London.

Read Case Study

 Morocco Mall

Morocco Mall, Casablanca, Morocco

Stretching across Corniche in Casablanca, and with a total surface area of 10 hectares, the Morocco Mall is the largest shopping mall project in North Africa, at a cost of 2 billion Moroccan Dirham (Eur=11.3MAD).

Read Case Study

ISF Camp

ISF Camp, Qatar

CCL were approached by their client to redesign an 18-metre steel beam to convert it to a post-tensioned beam.

Read Case Study

 Aberdeen ECC

Aberdeen Hospital ECC, UK

A £115 million emergency care centre (ECC) is being built in Aberdeen that will combine accident and emergency, an acute medical assessment unit, an out-of-hours GMED (Grampian Medical Emergency Department) service and ward accomodation at Aberdeen Royal Infirmary, in the largest project ever undertaken by the NHS in the north east of Scotland.

Read Case Study

 King Road Tower

King Road Tower, Jeddah, KSA

King Road Tower in Jeddah contains 36 floors of combined commercial and office space, a health club, two underground parking areas and a shopping mall at ground-floor level.

Read Case Study

 Casablanca Marina

Marina of Casablanca, Morocco

The Marina of Casablanca is 24 hectares of grounds, designated for regeneration and improvement by the Moroccan government and the urban district of Casablanca.

Read Case Study

 Loughborough Sports Park

The SportPark Loughborough University, UK

Developed by Sport England and Loughborough University, SportPark is an £11.5 million complex, which is home to the English national govering bodies of various sports, providing office space, storage areas and sports facilities.

Read Case Study

 St Rafqa

St Rafqa Basilica, Jrabta, Lebanon

Built on a mountainside at Jrabta in Lebanon, this imposing structure is designed to give the impression of a ship - its roof appearing to form a continuation of the surrounding hillside.

Read Case Study

 Uni of Rochester

University of Rochester, New York, USA

The Wilmot Cancer Centre at the University of Rochester in the state of New York is a 140,000 sq ft (42,672 m2) cancer research institute.

Read Case Study

 Wandle Park

New South Quarter - Wandle Park, Croydon, UK

New South Quarter is a £160 m contemporary urban village on the Purley Way, one mile from Croydon town centre and within easy travelling distance of London.

Read Case Study

SkyGate

Sky Gate, Beirut, Lebanon

To accommodate the Lebanese law of setback requirements and because of its location between two buildings, the 42-storey Sky Gate residential development in Beirut has particularly unconventional geometry.

Read Case Study

 City of Lights

City of Lights, Abu Dhabi, UAE

The City of Lights, a new residential, commercial and business complex, is located on Al Reem Island, off the coast of Abu Dhabi. It includes the construction of a 61-level, 282.1 m-high office tower on top of a six-level podium structure with three basement car-parking levels.

Read Case Study

 Eagle House

Eagle House, London, UK

Eagle House stands at the heart of a new flagship mixed-use development close to the financial area of London.

Read Case Study

 Paradise Dock

Paradise Dock, Lee Valley Park, London, UK

Paradise Dock on the River Lea in Hackney, east London was built in the 1830s to serve thriving local businesses, including the glass works, boat builders, indian rubber factory and the famous Carbonic works. Decommissioned and filled during the 1960s, the two-acre dock and surrounding area is now part of a large-scale regeneration project known as Paradise Park.

Read Case Study

 Olympic Village

Olympic Village, London, UK

The £2 bn Olympic Athletes’ Village was situated in the Olympic Park that hosted the London 2012 Olympic Games, allowing athletes to live within walking distance of the competition venues.

Read Case Study

 Waves Tower

The Waves Towers, Dubai, UAE

The Waves is a 600,000 sq ft (55,742 m2), two-tower freehold residential development, home to the city’s first residential waterpark and located in the prestigious Marina area of Dubai.

Read Case Study

 Worcester Library

 

Worcester Library and History Centre, UK

The Worcester Library and History Centre, also known as The Hive, is the first fully integrated public and university library in Europe. It consists of 10,000 sqm of public space over five floors.

Read Case Study

Marina 101

Marina 101 Tower, Dubai, UAE

Marina 101 is an iconic structure that will stand tall along Dubai’s skyline, strategically located in the prestigious Dubai Marina.

Read Case Study

 Latitude 39

Latitude 39 Indianapolis, IL, USA

Latitude 39 Indianapolis is a 60,000 square feet luxury entertainment complex which includes restaurants, bars, luxury bowling, cinema and nightclub.

Read Case Study

 Bolanachi Building

Bolanachi Building, Bermondsey Spa, UK

Bermondsey Spa is a £150 million regeneration programme on the south bank of the River Thames. Covering 50 acres, the project will be delivered over a period of seven to ten years. CCL was engaged to supply and supervise the installation and stressing of CCL’s new flat slab un-bonded 0.6” XU system to eight levels of the Bolanachi Building at the heart of Bermondsey Spa.

Read Case Study

 Silverene Towers

Silverene Twin Towers, Dubai, UAE

The Silverene Towers, located at the water’s edge of the Dubai Marina, rise 35 storeys high and have a total floor area of 108,174 m2.

Read Case Study

 Highfield Humanities

Highfield Humanities College, Blackpool, UK

Designed by the award winning architectural practice Feilden Clegg Bradley Studios, the state-of-the-art college was built under the Government’s BSF (Building Schools for the Future) scheme.

Read Case Study

 SPark One

Bristol & Bath Science Park, Bristol, UK

The SPark is a 54-acre £300 m development which opened in summer 2011 acting as a centre to connect businesses to new technologies.

Read Case Study

 La Galilee

Le Galilée Zac Andromede Blagnac, France

Le Galilée was designed by French architects Studio Bellecour, and is primarily an office building. It is located in the Andromède Urban Development Zone in Blagnac, near Toulouse in France.

Read Case Study

Precast+

King Abdullah University

King Abdullah University of Science and Technology, KSA

King Abdullah University in Saudi Arabia is a multi-billion dollar, 36,000 m2 installation of communities, recreation facilities, university grounds and other resources. The main campus is located at Thuwal, 80 km north of Jeddah.

Read Case Study

KONBET

KONBET New Precast Factory, Poland

The market for precast production in Poland was boosted when, along with partners in Ukraine, the country won the race to co-host UEFA Euro 2012.

Read Case Study

Repair And Strengthening+

Albertslund Bridge

Bridge No.502 Albertslund, Denmark

In 2006, inspection of bridge no. 502, in Albertslund, Denmark, identified structural degradation caused in part by high concentrations of chloride, particularly near to the abutments.  In response to this, a programme of refurbishment was commissioned by Albertslund Council.

Read Case Study

Bolingbroke Heights

Bolingbroke Heights, Flint, Wales

CCL has completed reinforcement work on Bolingbroke Heights sheltered accommodation in Flint, North Wales.

Read Case Study

 Pont Neuf

Pont Neuf, Sens, France

CCL post-tensioning systems were used on the refurbishment of Pont Neuf bridge, which crosses the River Yonne 125 km southeast of Paris, after a structural investigation carried out in 2008 identified weaknesses within the structure that required reinforcement.

Read Case Study

 Vastern Rd Bridge

Vastern Road Bridge, Reading, UK

As part of plans to double passenger capacity at Reading station by 2030, a 40 m long, 17 m wide bridge deck weighing 1000 t has been installed.

Read Case Study

 Tesco Liverpool One

Tesco Liverpool One, Liverpool, UK

A brand-new shopping, residential and leisure area covering 42 acres at the heart of the city, Liverpool ONE is a £1 bn development of 30 buildings divided into six districts, each with its own distinctive character.

Read Case Study

 2B+G+7 Residential

2B+G+7 Residential Building, Doha, Qatar

Though CCL was not part of the original construction team, their expertise was sought as testing at 28 days raised concern over the compressive strength of the concrete in the columns and core walls at level five of the building.

Read Case Study

 Hotrot Composter

Hotrot Composter, Kingsnorth, UK

Waste management specialists HotRot Organic Solutions completed the construction of a new composting facility in Kingsnorth, Kent.

Read Case Study

 London Bridge

London Bridge, London, UK

The new London Bridge was completed in 1973 and replaced John Rennie’s granite bridge, which had become too narrow to cope with the volume of traffic.

Read Case Study

 Commercial Building

Commercial Building, Doha, Qatar

Change of use at a commercial development in Doha called for the addition of an escalator and an elevator to provide access between the ground floor and the mezzanine floor.

Read Case Study

 British Museum

British Museum, London, UK

Inadequate exhibition space and scattered conservation facilities prompted the redevelopment of buildings on the British Museum site in Bloomsbury, London, for display, conservation and storage purposes.

Read Case Study

 The Gate Tower

The Gate Tower 2, Doha, Qatar

The Gate Towers are home to some 3,500+ luxury residential apartments across three 66-storey towers, with a further 21 luxury penthouse suites found above these, along a two-level sky bridge, which has effectively turned the building into an attraction in its own right.

Read Case Study

 ATA

American Trucking Association, Washington, USA

In 2010, the American Trucking Association decided to add a roof terrace to its headquarters in Washington, D.C.

Read Case Study

 Ferrybridge C

Ferrybridge C Power Station, Wakefield, UK

Ferrybridge C Power Station was situated on the River Aire near Ferrybridge in West Yorkshire, England. Two of the four units at Ferrybridge C were fitted with flue-gas desulphurisation (FGD) plants. In July 2014 the power station suffered a major fire to one of its two FGD plants.

Read Case Study

 

Churchill Towers, Dubai, UAE

Situated on the longest road in the entire UAE, Sheikh Zayed Road, Churchill Towers consists of two structures - one featuring residential units and the other built for business purposes - with an overall area of 2.5 million square feet.

Read Case Study

 Kensington High Street

375 Kensington High Street, London, UK

375 Kensington High Street is a collection of apartments and penthouses by St Edward which is located in one of London’s most prestigious neighbourhoods.

Read Case Study

 Lemongrass Restaurant

Lemongrass Restaurant, Latifa Towers, Dubai, UAE

The Lemongrass Restaurant can be found on the first floor of Latifa Towers, a mixed-use building, providing space for commercial, residential and retail activities.

Read Case Study

 Ratcliffe Powerstation

Ratcliffe-on-Soar Power Station, Nottingham, UK

Ratcliffe Power Station is one of the largest and most efficient coal-fired power stations in the UK. First commissioned in 1968, the plant has eight cooling towers with a capacity of more than 2,000 MW and supplies enough electricity to meet the needs of two million people.

Read Case Study

 Primark

Primark Store, Worcester, UK

Budget fashion retailer Primark opened  a new outlet in the CrownGate Shopping Centre, in the middle of Worcester on 2nd December 2010.

Read Case Study

Dronfield Tanks

Dronfield Sewage Tanks, Dronfield, UK

Six cylindrical concrete sewage tanks located in Dronfield, near Sheffield, required inspection in order to assess their structural condition. The tanks were constructed during the 1970s, and were beginning to exhibit signs of age.

Read Case Study

 Grand Hotel Viaduct

Grand Hotel Viaduct, Saoufar, Lebanon

The Grand Hotel Viaduct is a continuous eight-span structure with two independent decks, both 310 m in length and 15 m wide. Each deck is composed of three hollow precast box girders.

Read Case Study

 Al Badia Residences

Al Badia Residences, Dubai, UAE

Dubai Festival City is a 1300-acre urban community that has been designed to capture the groundbreaking 21st-century spirit of Dubai. Situated within the city are Al Badia Residences, an exclusive retreat comprising spacious Mediterranean-style townhouses and apartments.

Read Case Study

 Connahs Quay

Connahs Quay Power Station, Wales, UK

Connah’s Quay is a natural-gas-fired Combined Cycle Gas Turbine (CCGT) power station.

Read Case Study

 Prime Business Centre

Prime Business Centre, Dubai, UAE

Located along the Sheikh Mohammad Bin Zayed Road, one of the major thoroughfares in the Emirates, the Prime Business Centre (PBC) is home to corporate and commercial enterprises in the Jumeirah Village Circle development.

Read Case Study

 Old Burlington Street

Number 30 Old Burlington Street, London, UK

Number 30 Old Burlington Street is located in London’s West End, in the heart of the fashion and arts district of Mayfair, close to Bond Street. The new development will consist of 42 luxury apartments with boutique-hotel-style amenities, together with art gallery spaces on the lower ground and ground floors and part of the first floor.

Read Case Study

Tiara Hotel, Dubai, UAE

Tiara Hotel and Residences is a beachfront community located along the upper-right side of the trunk of the Palm Jumeirah.

Read Case Study

Congleton Road and Malkins Bank Bridge Works, Cheshire, UK

Deterioration of existing piers on the Congleton Road and Malkins Bank Bridges between junctions 16 and 17 of the M6 motorway was caused by the use of de-icing salts on the M6 and constant saturation.

Read Case Study

Shopping Mall, Dammam, KSA

During the construction of a new shopping mall in Dammam, it was decided that part of the structure originally destined to become a parking area, would be converted into a hypermarket.

Read Case Study

Structural Bearings+

Bond Street Station

Bond Street Station, London, UK

Located in the UK’s busiest shopping district, Bond Street station is expecting to see an increase in rail transport by at least 10 per cent per year, with the speed of travel across London increasing due to the arrival of the Crossrail Interchange in 2018.

Read Case Study

 Heathrow Airport

Heathrow Airport, Terminal 5, London, UK

One of Europe’s largest construction ventures, Terminal 5, was designed to handle around 30 million passengers a year. With 16 major projects and over 147 sub-projects, the scheme encompassed a vast and hugely complex programme of works.

Read Case Study

 Wimbledon Roof

Wimbledon Centre Court Roof, London, UK

The 5,200 m2 PTFE concertina forms a retractable roof on Centre Court at the All England Lawn Tennis Club in Wimbledon.

Read Case Study

 Rochester Old Bridge

Rochester Old Bridge, Rochester, UK

Based on its knowledge and expertise in the area of bridge bearings, CCL was commissioned to inspect the original roller and fixed bearings, installed in 1914, on the Rochester Old Bridge, a Victorian bridge in bowstring arch style.

Read Case Study

 Bridgwater Bearings

Little Sydenham Farm Bridge, Bridgwater, UK

CCL’s main objective was to design bespoke bridge bearings to fit within restricted spatial requirements, as well as meeting a tight delivery schedule. The project involved the construction of a road bridge over a mainline railway, allowing a newly constructed residential area to be connected with Bridgwater via Bristol Road.

Read Case Study

CONTACT US

CCL
Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield