• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Bristol & Bath Science Park, Bristol, UK

The SPark is a 54-acre £300 m development which opened in summer 2011 acting as a centre to connect businesses to new technologies. Located eight miles from Bristol and 15 miles from Bath (with junctions 19 and 20 of the M4 close by) the park is easily commutable to London, Birmingham and other major cities.

CCL worked on SPark One, the project’s first building, from October 2010 to January 2011. It supplied the design and materials, and carried out the installation of its XF10, XF20 and XF30 post-tensioning systems.

Sustainability is an important factor for the park and it aims to be a zero-carbon site. In line with this, the objective of CCL’s solution was to minimise the quantities of materials used, by reducing the thickness of slabs, and creating exposed soffits to fully exploit the thermal-mass properties of the concrete. Post-tensioning provided increased crack control to the underside of the slabs.

Area director of the South West RDA, Ian Knight, said: "The success of major science parks elsewhere in the country demonstrates how clustering high-tech research companies close together really does work. The support at SPark will mean young, highly innovative businesses are connected to the best academic facilities and inward investment opportunities, attracting new business, investment and ultimately employment into the area."

 

  • Download Case Study
  • Go Back
  • SPark One

    CONTACT US

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    Get In Touch


    Website design and build by Grey Matter | web design sheffield