• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

American Trucking Association, Washington, USA

In 2010, the American Trucking Association decided to add a roof terrace to its headquarters in Washington, D.C.

Before this could commence, an investigation of the existing roof structure was required, to determine if the revised loads could be supported.

CCL was commissioned by Baker Concrete to carry out a full evaluation of the existing structure, including the status of the post-tensioning tendons, and to propose strengthening options.

As a result of the study, further strengthening was deemed to be required. Two options were considered: external post-tensioning, and jacketing with post-tensioned tendons. CCL evaluated each beam independently and found that in most areas additional strengthening using jacketing with PT was adequate, which had significant cost-saving implications for the client. In one area only, replacement of the existing beam was required.

Space around the beams was limited. In order to overcome this problem, CCL proposed a bespoke PT solution and designed special multistrand anchors to work with unbonded tendons. This facilitated access, reduced repair work and kept costs to a minimum.

The beams were tied into the existing slab to benefit from the full concrete section, the beams were tied into the existing slab, and the slab-column connection was checked to ensure that the new anchors could be housed and the force transferred back to the columns. As parts of the tendons would remain exposed, the anchorages were designed to be fireproof and encapsulated, to meet fire and durability requirements.

CCL’s careful evaluation and its intelligent, cost-effective solution made efficient use of the existing structure, and minimised disruption and cost.

 

  • Download Case Study
  • Go Back
  • ATA

    CONTACT US

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    Get In Touch


    Website design and build by Grey Matter | web design sheffield